Your Renovation Electrical Handover
Electrical handover is the point where an installation becomes something you can understand and maintain. Use a documented review with the electrician—not DIY electrical testing—to close out the renovation.

Review the agreed scope room by room
Bring the final electrical plan and approved variations to the handover. Walk through accessible areas with the contractor and compare installed outlets, lights and controls against the agreed scope. An owner’s visual review does not replace the electrician’s required testing.
Record missing fittings, damaged finishes or changes that were agreed during construction. Separate incomplete work from a new request: an extra outlet added at handover may be a variation rather than a defect. Give each open item an owner and an agreed next step.
Ask for a practical demonstration
Have the electrician explain which switches control which lights, how dimming behaves and how any timers or sensors are intended to work. Review a normal evening scene as well as the bright construction setting; usability issues are easier to discuss while the installer is present.
For connected controls, clarify account ownership, normal manual operation and what happens without internet access. Do not accept shared installer credentials as a permanent household arrangement. Keep passwords in your own secure password manager, not on a publicly visible handover sheet.
- Identify user-accessible controls without removing covers.
- Ask how to obtain help for a tripping circuit or failed fitting.
- Confirm who handles product support versus installation concerns.
Collect records you can use later
Ask what compliance documentation applies to the completed electrical work in NSW and when it will be supplied. Keep it with the final scope, invoices, product manuals and warranty terms. A collection of appliance receipts alone is not a record of the wiring work.
Request clear circuit identification and an explanation of any special arrangements. Where available, keep updated plans and installer photographs of concealed routes; treat these as reference information, not permission to drill or undertake electrical work yourself.
- Final fitting models, lamp specifications and compatible replacement information.
- Approved variations and a list of outstanding works.
- Maintenance instructions and the appropriate contact for each system.
Report concerns without investigating wiring
If a control does not behave as demonstrated, record the room, time and normal action that produced the issue. Do not repeatedly reset protection, remove a fitting or recreate a suspected dangerous fault. Burning smells, shocks or sparking require prompt safety advice, not a routine snagging email.
For residential electrical work with ZEOS, ask about handover expectations while the scope is being agreed. This gives both parties a clearer definition of completion and avoids leaving documentation until after the builder has left.
General planning information, not a diagnosis or electrical work instructions. Requirements and equipment suitability must be confirmed for your property.