A smart-meter appointment can involve different parties from ordinary electrical work. Start by confirming the retailer’s process and whether the property needs separate preparation before the metering visit.

Confirm who is arranging the meter work
Contact the electricity retailer to confirm why the meter is being changed, who is appointed to attend and what information they need. Do not assume a general electrician or Level 2 provider can independently complete every retailer-appointed metering task.
Ask what the appointment includes and whether any separate electrical defects or enclosure changes must be resolved first. The distributor, retailer and metering provider have different responsibilities. Keep reference numbers and written instructions together so contractors receive consistent information.
Describe access without opening equipment
Tell the coordinator if the meter is behind a locked gate, in a shared room, near pets or accessible only through an occupied tenancy. Confirm who will provide entry and whether building-management approval is needed. A booked date is not useful if the attending party cannot reach the location safely.
Report known damage or access problems from a safe position. Do not remove covers, seals or panels, clear vegetation close to electrical equipment or try to inspect inside an enclosure. Ask the appointed party what information can be supplied safely.
Prepare for the agreed interruption
Confirm whether supply will be interrupted, the notified window and the contact for changes. Identify medical equipment, refrigeration, remote work and access controls that need a plan. Discuss medical or critical equipment with its relevant provider rather than relying on an estimated appointment duration.
After the work, follow the attending party’s advice and have equipment owners check ordinary operation. Do not use the appointment as an opportunity to request unrelated wiring changes unless these have been separately scoped and authorised.
- Keep the nominated contact available.
- Make agreed entry arrangements and notify affected occupants.
- Retain the completion record and any advice about follow-up work.
Scope property preparation separately
If the retailer identifies switchboard, enclosure or wiring work outside the appointment, ask for the requirement in writing. An electrician can then assess that scope and identify any required network authorisation or coordination. Do not interpret an appointment refusal as proof that every part needs replacement.
ZEOS metering-related enquiries should include those written requirements. Ask which property work can be assessed and which tasks remain with the retailer or its appointed metering parties.
General planning information, not a diagnosis or electrical work instructions. Requirements and equipment suitability must be confirmed for your property.
Need help with smart meter installation?
Send the retailer’s instructions and explain access or interruption concerns. Ask which electrical preparation is needed before the appointed metering party attends.
Explore Smart Meter Installation with ZEOS →